Head of Atomic Energy Organization of Iran: Waiting for orders

Head of Atomic Energy Organization of Iran: Waiting for orders
ID : N-4219 Date : 2019/01/31 - 10:57

(Persia Digest) – The Head of Atomic Energy Organization of Iran (AEOI) has said: “We have carried out all the preparations ordered by the Supreme Leader to reach a 190 thousand SWU capacity. This includes the construction of an advanced centrifuge assembly line and its installations.”


Read more:

Salehi warns EU: Iran patience running out

Iran ready to increase enrichment capacity

Iran builds new centrifuge rotor factory

Iran may increase uranium enrichment


Ali-Akbar Salehi pointed out that 15 thousand engineers are working in Iran’s atomic energy sector, saying: “We have crossed the thresholds of exploration, extraction, design of reactors and centrifuges, and heavy water in the nuclear industry.”


Read more:

Salehi: EU proposals not enough to keep JCPOA

Amano in Tehran: Iran is committed

Salehi: Advanced centrifuge infrastructure ready


He stated that the process of construction of the Arak reactor has slowed down with the pressures of the President of the United States, adding: “We want to tell them that our work  will progress if they choose to continue this trend and we have a number of options open to us.”

Click here for more political news.

Comments

captcha Refresh

Rate this post

0 Users rated to this post

Related posts